2017 High Speed good price of automatic carton box packing machine

FOB Reference Price:Get Latest Price
US $26,000-41,200 / Sets | 1 Set/Sets 2017 High Speed good price of automatic carton box packing (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Type:
Other
Condition:
New
Application:
Beverage, Chemical, Commodity, Food
Packaging Type:
Bags, Bottles, Cans, Pouch
Packaging Material:
Paper
Automatic Grade:
Automatic
Driven Type:
Electric
Voltage:
Customized
Power:
3KW
Place of Origin:
Jiangsu, China (Mainland)
Brand Name:
JINRONG
Model Number:
ZX15
Weight:
1200kg
Dimension(L*W*H):
4500*800*2050(mm)
Certification:
CE ISO
After-sales Service Provided:
Engineers available to service machinery overseas
Packing material:
paper
Packing speed:
15 Bags/min
Warranty:
12 Months
Function:
Automatic bottle carton packing Line
Machine name:
Automatic carton packing machine for bottles
Supply Ability
Supply Ability:
20 Set/Sets per Month 2017 High Speed good price of automatic carton box packing
Packaging & Delivery
Packaging Details
Wooden box
Port
shanghai
Lead Time :
30 Days

.jpg12.jpg15.jpg14.jpg13.jpg20150921142415441.jpg

 

            Description

1) voltage:380V(± 10%max)50Hz 3PH+PE.

2) For non-380V voltages, can provide an auto transfer.

3) Control voltage: 24V DC ,Schneider low voltage control system

4) According to the IEC 529 standard, the electrical cabinet protection grade is IP54, Button protection grade is  IP65

5) Insulating refractory cable (paint color according to the DESINA standard)

6) Total switch: domestic brands

7) Panel buttonØ30mm:Schneider

8) proximity switch: South Korea

9) With the joint of the photoelectric tube IP67 diameter18 D 

10) Relay connector conforming to Din50-022-35 standard

11) Rapid stand joints conforms to the Din50-022-35 standard

12) Contactor relay with the French Schneider TE/ABB

13) frequency converter is Taiwan Teco

14) main controller: Germany Siemens

15) Asynchronous motor: Domestic

16) Other electric driving device in accordance with the IEC529 standard is not less than IP54

17) Gear motor; China

18) Bearing: TR

19) Chain: polymer plastics

20) Electronic valve in accordance with ISO 505599/1/0 standard

21) Cylinder and its accessories:AIRTAC or SMC

22) The production line to set multiple fault protection and alarm and fault alarm device. All the fault alarm details are on the touch screen to highlight, prompted the need to solve the content and the main measures. The main action mechanism is provided with an electronic detection, automatic fault correction system is provided with a mechanical motion system, also can use manual reset button, the system automatically detecting and correcting .

                 Technical parameters

oversize(L/W/H)

4500*800*2050(mm)

total installed capacity

3KW

Main Power

AC3-380V/50HZ+G+E

optimal working temperature

-10℃~40℃

Auxiliary power supply

24VDC

pressure of compressed air

0.4~0.6Mpa

Consumption of compressed air

1500L/Min

weight

1200KG

Our Company
Certificate

_07 

Why Choose Us

_05 

FAQ

 

_10

 

(1)Q:Are you a manufacturer or a trading company ?

   

    A: We’re a big manufacturer and we’ve been making beverage machines more than 30 years 

    Factory scale: >150,000m2

    Employee members: 260

 

(2) Q: where is your factory located ?

   

     A: Zhangjiagang city ,around 2 hours car ride from Shanghai, and we can provide pick-                          up service for customers.

 

(3) Q: do you only produce filling machine or you can supply the whole line?

     A: We’re capable of supplying a complete line with top level quality. 

     We’re different from most companies in the market who only can produce filling machine,

     We also produce blowing machine, water treatment etc. by ourselves

(4) Q: What’s the delivery time?

   

     A: we have a lot of nearly-finished machines in stock, 

     so normally delivery time is 10days after receiving your down payment and samples 

     if the model you need is within our stock.

     If not, delivery time is around 35days.If a complete line, 

     delivery time is normally 40~45days after bottle drawing is confirmed and samples are received.

 

(5) Q: How about after-sale service?

      A: We’ll send a professional installation team to customers after machines reach factory, 

      and provide training to their workers how to operate, maintain, and repair the machines.Besides, 

      we have a more than 1000m2 warehouse especially for spare parts storage, 

      once customers’ spare parts need a replacement, we’re able to send within a very short time.

(6) Q: Why is your price higher than other companies?

      

      A: Firstly, different qualities means different prices,

      We have a plenty of cases that some customers were attracted by some lower prices 

      from small factories,

      and machines began to have kinds of issues after running it several months, 

      finally they came to us even our price is higher than others, because they know the machine

      We’re looking forward to your visit and hope you can compare the quality carefully 

      before making any decision.

 

Contact Us